According to the Communications and International Affairs Department of Arak Metropolitan Municipality, Habibi, the manager of District 4 of Arak Metropolitan Municipality, presented a report on the first six months of the year’s civil works, which shows special attention to improving streets and citizens’ welfare. Based on this report, Habibi said: during this period, asphalt resurfacing was carried out across the district in a combined manual and mechanized manner, with a total volume of about 10,000 tons, around the clock. In addition, sidewalk paving operations covering an area of 4,200 square meters have been placed on the agenda. It is worth noting that, with the aim of directing surface water and preventing flooding, curb installation work totaling 1,200 meters was carried out in various parts of the district. The manager of District 4 of the municipality announced: efforts have been made to implement projects with high quality and in the shortest possible time, and to provide safe and durable urban routes for citizens. He added at the end: the focus of the second half of the year will be such that urban services are provided evenly across all areas.
Tags:
Short link:
taxirani.arak.ir/s/sc0063